The short version
A general contractor estimate often spans several trades, so it has to show how the total is built before subcontractor prices are final. A good general contractor estimate separates the lines you are sure of from the ones that depend on what you find, and gives the client a range.
Open the cost estimator for general contractorsGeneral contractor estimate lines and allowances
The estimate below is for an early budget conversation for a remodel, before plans and finishes are chosen. Each line is either firm or an allowance with a range of quantities. The rates are examples from the starter lines in the cost estimator, not market prices, so replace them with your own.
| Line item | Unit | Qty or range | Example rate | Basis |
|---|---|---|---|---|
| Site preparation and set-up | job | 1 | $450.00 | Firm |
| Waste removal and site clean | job | 1 | $180.00 | Firm |
| LaborAllowance: crew days depend on the final scope. | day | 5 to 12 | $320.00 | Allowance |
| Materials and supplies, at costAllowance: materials stay an allowance until finishes are chosen. | job | 1 to 2 | $1,200.00 | Allowance |
| Materials markup (15%)Allowance: markup moves with materials. | job | 1 to 2 | $180.00 | Allowance |
Worked estimate range
Adding the firm lines to the allowances at their smallest and largest quantities gives a low end and a high end. The tax rate is an example only, so use your own and your local treatment.
| Estimate range | Low end | High end |
|---|---|---|
| Firm lines | $630.00 | $630.00 |
| Allowances (minimum and maximum quantities) | $2,980.00 | $6,600.00 |
| Subtotal | $3,610.00 | $7,230.00 |
| Sales tax at an example rate of 8% | $288.80 | $578.40 |
| Estimated total | $3,898.80 | $7,808.40 |
This is not a fixed price. It is a range the client can plan around until the unknowns are resolved.
Assumptions behind a general contractor estimate
- Scope. The range assumes the scope as described and no structural changes.
- Finishes. Materials are an allowance until finishes are chosen, and the markup moves with it.
- Subcontractors. Subcontractor prices are placeholders until bids are received.
What can change the price
Write these on the estimate so a revised figure is never a surprise:
- Finishes chosen above the allowance.
- Hidden conditions behind walls and floors.
- Permit requirements and inspection findings.
When to send a quote instead
A general contractor gives an estimate early, to see whether the project is in the client's range, and a quote once plans, allowances and subcontractor prices are in. Once the scope is fixed, move to the general contractor quote template, which adds a fixed scope, exclusions, a payment schedule and a place to sign.
Start your general contractor estimate
Pick the trade, set the quantities and ranges for your own job, and download it. Nothing needs an account.