Drywall is the trade where the customer cannot see most of what they paid for once the paint is on, so the invoice has to say which level of finish they bought.

The Contractor preset is the closest to drywall; retype the lines. Open the invoice generator.

The short cut

To write a drywall invoice, bill hang and finish per square foot of board surface, name the GA-214 finish level for each area, price small repairs by the hour with a minimum, put each change order on its own numbered line, and credit the deposit and stage payments so the balance can be traced.

Drywall is built in stages, so bill it that way

Board goes up, joints get taped, compound goes on in coats with drying time between them, and then someone sands. A single invoice at the end hides all of that and leaves you carrying material and labor for the two or three weeks the coats take. Split the job at the points the customer can see: a deposit at signing, a payment when all the board is hung, and the balance when finishing is complete.

Set the percentages so you are never more than one stage ahead of the money, and write them on the contract with the event that triggers each. "Board hung" is a fact anyone can check by walking in. "Fifty percent complete" is an opinion, and opinions get paid late.

Name the finish level, because the paint will reveal it

This is the one line that belongs to drywall alone. The Gypsum Association's GA-214 defines levels of finish from 0 to 5, and National Gypsum summarizes what each is typically specified for. The current edition is GA-214-2021, Levels of Finish for Gypsum Panel Products, released in February 2022 as Global Gypsum reported.

LevelWhat National Gypsum says it is for
0Board left as installed, no tape, finishing or accessories
1Smoke barrier joint treatment and areas not open to public view
2Board used as a substrate for tile
3Appearance areas that will receive heavy or medium texture
4Smooth walls with flat paint, light or non-continuous texture, or wallcovering. Not recommended for non-flat or dark paint
5Non-flat, glossy or dark paint, or critical lighting. Adds a skim coat over the entire surface

Summarized from National Gypsum's page on GA-214. The Gypsum Association owns the standard; read the current edition before you quote against it.

Homeowners do not know the levels exist. They know that after the painter rolls on semi-gloss, the wall by the window shows every joint. If the contract and the invoice say Level 4, and Level 4 is the level that is not recommended for non-flat paint, you have a clear answer: the finish is what was bought, and a skim coat is a change order. Without the words on paper, the argument is about whether the wall is perfect, and nobody wins that one.

Drywall invoice example, filled in

The final invoice for a basement finish. Hang and finish are priced per square foot of board surface, the great room and hall carry a Level 5 skim coat for semi-gloss paint, and an approved change order sits on its own line. Quantities and rates are samples.

INVOICE

INV-2026-203
Issued 3 November 2026
Due 14 days from issue
Drywall
Your business name
Your address
Your phone and email

Bill to

Tom and Rosa Alvarez
41 Granite Hill Rd

Job

Basement finish
Contract C-2026-044

DescriptionQtyRateAmount
Hang 1/2 in. board, walls and ceilings
Per sq ft of board surface
1850$1.10$2,035
Tape and finish to Level 4
Per sq ft, smooth walls for flat paint
1850$1.05$1,942.50
Level 5 skim coat, great room and hall
Per sq ft, specified for semi-gloss paint
420$0.70$294
Change order CO-1, soffit and closet returns
Approved in writing 28 October
1$380$380
Dump fee and cleanup
Scrap and dust, one trip
1$120$120
Subtotal$4,771.50
Total$4,771.50
Deposit paid at signing-$427.15
Hang stage paid 22 October-$1,200
Balance due$3,144.35
Finish. Level 4 throughout and Level 5 where marked on the plan, as defined in GA-214. A different level is a change order.
Complete. Finishing is complete when the last coat is sanded and the walls are primer-ready. One return visit for touch-up after the first coat of paint is included.

Five lines total $4,771.50. The deposit was 10% of the $4,271.50 base contract, which is $427.15, the hang stage was $1,200, and $3,144.35 is due. The change order was signed after the deposit, so it is billed in full here.

Square feet, sheets and hours

Price hang and finish per square foot of board surface, which is wall and ceiling area, not floor area. A customer can check the area of a room; nobody can check how many sheets you cut. If you buy by the sheet, convert before you quote: a 4 by 8 sheet covers 32 square feet, so 1,850 square feet is about 58 sheets before waste. Put the area in the Qty column and the unit in the description, so 1,850 and sq ft are both visible.

For a sense of scale only, the Inch Calculator cost guide, updated in October 2023, gives an average installed range of $1.50 to $3.50 per square foot and notes that higher finish levels take more work. Your labor, your market and your finish level set your rate.

Repairs are different. A patch behind a range takes the same three coats and three trips as a whole room, so bill it by the hour with a minimum and a separate materials line.

INVOICE

INV-2026-219
Issued 12 November 2026
Due on receipt
Drywall repair
Your business name
Your address
Your phone and email

Bill to

Joyce Bennett
7 Station Street, unit 2

Work

Kitchen wall repair
Quoted as time and materials

DescriptionQtyRateAmount
Patch and repair, kitchen wall behind range
Hours, cut out water damage, new board, three coats
3.5$75$262.50
Materials
Board offcut, tape, compound, corner bead
1$48$48
Subtotal$310.50
Total due$310.50
Basis. Time and materials, two-hour minimum. Finish matched to the surrounding wall, which was not a smooth Level 4 surface.
Not included. Painting, and any plumbing behind the wall.

Three and a half hours at $75 is $262.50, plus $48 of materials, for $310.50. The note about matching the existing texture is there because a patch that does not match is the most common repair complaint.

Change orders, retainage and the final payment

Every added soffit, moved doorway or late request for a smoother finish goes in as a numbered change order, signed before you hang a sheet, and appears on the invoice as its own line with that number and date. Folded into the base price, it looks like the contract grew by itself.

On commercial work and larger residential jobs you may meet retainage, a percentage of each payment held back until the job closes. Show the held amount as a line on every pay request so both sides can see what is still owed. Final payment on a drywall job often stalls while other trades finish, so know your lien deadline before it passes; the mechanic's lien deadlines by state page lists them.

The three complaints, and the line that answers each

"The joints show." Answered by the finish level line and the paint the customer chose. If they changed from flat to gloss after signing, that is a change order, priced as a skim coat.

"You left a mess." Answered by a dump and cleanup line that says what cleanup means: scrap removed, floors swept, dust bagged. Sanding dust in the next room is a common fight, so say whether you mask doorways.

"It cracked." Answered by a sentence on what you warrant. Workmanship on joints for a stated period is yours. Cracks from framing movement or a settling house usually are not, and the invoice is a good place to say so in one line.

Before you send it

  • Finish level for each area, matching the contract.
  • Board thickness and type where it changes, such as moisture-resistant board in a bathroom.
  • Area in square feet of board surface, not floor area.
  • Each change order by number with its approval date.
  • Dump and cleanup as a line, with what cleanup includes.
  • Deposit and stage payments as dated credits, and any retainage held.
  • What counts as complete, and what touch-up after paint is included.

Write the finish level into your next invoice

Open the generator, set the lines to square feet and type the level beside each area. Free, and the PDF prints on one page.

Open the invoice generator

Drywall invoice questions

How do I bill a drywall job?

In stages: a deposit at signing, a payment when the board is hung and the balance when finishing is complete. List hang and finish as separate lines by square foot of board surface.

What are the levels of drywall finish?

GA-214 from the Gypsum Association defines levels 0 to 5. National Gypsum summarizes Level 4 as suited to smooth walls with flat paint, and Level 5, which adds a skim coat over the whole surface, for glossy or dark paint and critical lighting.

Should I charge per sheet or per square foot?

Per square foot of board surface is easier for a customer to check. A 4 by 8 sheet is 32 square feet if you need to convert from what you bought.

How do I invoice a drywall patch?

By the hour with a minimum and a separate materials line, since a small patch takes the same coats and trips as a larger area.

What if the customer wants a smoother finish after we start?

Treat it as a change order. The contract and invoice state the level bought, and a Level 5 skim coat is added work.

When should I send the final drywall invoice?

When the walls are sanded and primer-ready, before painting starts, so any touch-up discussion happens against your written scope.

Free drywall invoice template

The Contractor preset is the closest to drywall, with labor, materials and progress lines; retype them as hang, tape and finish. To work from a file, download the blank invoice as Word, Excel or PDF. A larger job with retainage is easier on the project invoice calculator, which handles percentage complete and retainage.

Tools for hanging and finishing crews

Chosen for staged drywall jobs.

What this is. A guide and template from InvoiceTools. It is not legal, tax or medical advice. Rules on deposits, sales tax, late fees and record keeping differ by state and by contract, so check the ones you rely on for your own state before they go on a real document.

Last reviewed by InvoiceTools, Houston, Texas, on 4 November 2026.

Write down the level and the change order, then send it

Drywall arguments start after paint, when the wall shows what the invoice never mentioned. The finish level and the signed change orders are the two lines that settle them.