The short version
Decorating is the trade customers think they can price themselves, because they can see the walls and they know what a tin costs. The invoice earns its money by showing the preparation, the coats and the paint as separate things rather than one number for a room.
What goes on a painting contractor invoice
Six things, in the order they belong on the page. The invoice generator opens a painting contractor document with the lines already in place, so most of this is checking rather than typing.
- Price by room or by square foot, and say which. Both are normal. What causes arguments is quoting one and invoicing the other.
- Put preparation on its own line. Filling, sanding, stripping and masking is most of the labor and none of what the customer sees.
- State the number of coats. Two coats over a primer is a different job from one coat over an existing color, and the invoice should say which was done.
- Show paint separately from labor. Name the brand and finish so the customer can buy the same tin for a touch-up in two years.
- Bill making good as a variation. Cracked plaster found under wallpaper was not in the quote, and it should not be absorbed into it.
- Set a punch list window in your terms. Decorating attracts small callbacks. A stated window converts an open liability into a defined one.
The lines a painting contractor invoice usually carries
These are the lines the generator opens with when you pick Painting contractor. The figures are a starting point to type over rather than a going rate: this site runs no pricing survey, and the number on your invoice should be the one you charge.
| Line | What it covers | Qty | Opens at |
|---|---|---|---|
| Surface preparation and filling | Wash down, fill and sand the surfaces, caulk gaps and spot prime as needed. Preparation is usually longer than the painting. | 1 | $220 |
| Painting (per room) | Cut in and roll the agreed number of coats to walls and ceiling, with woodwork where specified. | 3 | $280 |
| Paint and materials | Paint, primer, caulk, tape, dust sheets and abrasives for the whole job. | 1 | $190 |
| Labor (per day) | Time on site charged by the day, including masking up and clearing away each evening. | 2 | $240 |
Add, rename, reorder or delete any line, and set tax per line where it applies. Priced as they open, that comes to $1,730 before tax.
A worked painting contractor invoice, filled in
This is the same job as the table above, written out the way it would leave your phone. Every figure on it is a starting point rather than a going rate, and the tax line is shown at ten per cent purely so the arithmetic is visible: set your own rate, or none, per line.
INVOICE
Bill to
Your client name
Client address
Work carried out at
Job address
Job or order reference
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Surface preparation and filling | 1 | $220 | $220 |
| Painting (per room) | 3 | $280 | $840 |
| Paint and materials | 1 | $190 | $190 |
| Labor (per day) | 2 | $240 | $480 |
| Subtotal | $1,730 |
| Tax at 10% | $173 |
| Total due | $1,903 |
Late payment. State your own rate and when it starts, so it is agreed before the due date rather than argued after it.
Subtotal $1,730, tax $173, total $1,903. The parts worth copying are the structure rather than the numbers: the job reference next to the client, every line separately priced with its count showing, the tax on its own line, and terms that name a number of days instead of saying on receipt.
Preparation is the job, and the invoice has to show it
A customer looking at a finished room sees paint. They do not see the two days of filling, caulking, sanding and masking that made the paint look like that, and if the invoice does not name it they never will.
Break preparation out as its own line with its own hours. It changes the conversation from why is painting this room so expensive to why the preparation on this particular room took as long as it did, which is a question you can answer with the state of the walls.
It also protects you on comparison. A cheaper quote almost always contains less preparation, and a customer cannot see that difference unless one of the two documents states it.
Coats, color changes and the paint the customer bought
Coverage is the single most common cause of a decorating dispute. A strong color over white, or white over a strong color, needs coats that a straight repaint does not.
Say on the quote how many coats the price includes, and if the color choice arrives later and needs more, that is a variation with its own line rather than an argument at the end.
Where a customer supplies their own paint, note it on the invoice and state that coverage and finish are not guaranteed on customer-supplied materials. Cheap trade white is where this problem usually starts, and the line above is what stops a third coat being free.
Domestic against commercial, and the invoice each one needs
A homeowner wants to know what a room cost. A managing agent or a shopfitter wants a document they can process against a purchase order without reading it.
For commercial work, put the site address, the order number and the areas or unit numbers on the invoice, keep the descriptions consistent between visits, and use terms in days.
For domestic work the opposite is true: fewer lines, plain words, and the room names the customer uses. The same job can need two different documents and it is worth writing each one for its reader.
Hourly, fixed price or per unit: how painters and decorators price the work
Decorating is priced by room, by square foot or by the day, and the right one depends almost entirely on how bad the walls are. The area is easy to measure and the preparation is not, which is why the same room can be two very different jobs.
| Model | Where it wins | What it quietly costs you |
|---|---|---|
| Per room | Domestic repaints where the customer thinks in rooms | A high ceiling or bad plaster turns the profit into a loss with no line to point at |
| Per square foot | Large areas, new build, commercial work, anything measurable | It ignores cutting in and detail, which is where the hours actually go |
| Day rate | Restoration, heritage work, anything where the preparation is the job | Customers cannot compare it to anything, so it needs a scope beside it |
Whichever you use, price preparation as its own line. It is the majority of the labor, it is invisible in the finished room, and it is the only thing that explains why your quote is higher than the one that skipped it.
Working out what to charge
This guide is about what goes on the document, not what the number should be, and nobody should hand you a rate for your own market. What the site can do is the arithmetic: the freelance rate calculator works back from what you need to earn, the service price calculator prices a service against your costs, and the profit margin calculator checks what is left once the job is done.
Writing it on your phone, in five steps
Most painters and decorators write the invoice standing next to the work rather than at a desk a week later, and the week later version is the one that gets details wrong. The generator is built for the first case.
- Open it with your trade already chosen. The painting contractor invoice loads with surface preparation and filling and the rest of the lines already on the page.
- Put the client and the job reference in first. It is the part you will not remember accurately in three days, and on agent, landlord or contractor work it is the reason the invoice gets paid at all.
- Edit the lines rather than starting from empty. Change the quantities and the rates, delete what you did not do, add what you did. Keeping the descriptions means the wording stays consistent from one job to the next.
- Set the terms to 14 days and add a payment link. A due date that is an actual date gets chased. A link and a QR code means it can be settled before you have packed up.
- Send it before you leave. The clock on your terms starts when the invoice arrives, not when the work finished, so every day it sits unsent is a day added to getting paid.
Getting paid once it is sent
Put a due date and your terms on the document, because an invoice without them is hard to chase. Add a payment link and a QR so settling up is a tap rather than a transfer somebody has to set up. When part of it lands, the receipt maker records it as a part payment and prints the balance still due. If the due date passes, the late fee calculator works out what your own terms allow and writes the chasing letter to go with it.
Five dates decide whether a painting contractor gets paid on time, and four of them are set before the work starts.
Mistakes that cost painters and decorators money
- One price per room. Nobody can see the preparation, so the whole figure looks like paint.
- Coats unstated. A color change turns into a free third coat.
- Paint not named. No way to touch up later without matching by eye.
- Making good absorbed. Cracked plaster under wallpaper becomes free labor.
- No punch list window. Callbacks stay open forever.
Painting contractor invoice questions
How do I write a painting and decorating invoice?
State whether you priced by room or by square foot, put preparation on its own line, say how many coats, list paint separately with the brand and finish, and add any making good as a variation. The generator opens a decorating invoice with preparation, coats and materials already listed.
Should I price by room or by square foot?
Per room sells better to homeowners and per square foot is fairer on unusual spaces and commercial work. Either is fine as long as the invoice uses the same unit the quote did.
How many coats should I quote for?
Say the number rather than leaving it implied. Two coats is the normal expectation on a repaint, and a strong color change usually needs more, which should be quoted as such rather than discovered.
Should I supply the paint or should the customer?
Supplying it means you control the coverage and can stand behind the finish. If the customer supplies it, put a line on the invoice saying finish and coverage are not guaranteed on customer-supplied paint.
How do I charge for preparation?
As its own line with its own hours. It is the majority of the labor on most decorating jobs and the only part the finished room does not show.
What should a decorating invoice include?
Your details and the customer, the property, the rooms or areas, preparation, coats, paint with brand and finish, any making good, the total and your terms including a punch list window.
How do I handle punch list and callbacks?
Put a stated window in your terms, for example fourteen days for touch-ups on the work invoiced. It gives the customer confidence and gives you a defined end to your liability.
Free painting contractor invoice template
The free painting contractor invoice template opens with the lines above already priced, in any of 200 designs, and exports a print-ready PDF with no signup and nothing saved to a server. If you would rather edit a file offline, there are 72 Word templates, 72 Excel templates with the totals already calculating, and 72 fillable PDFs.
Invoicing guides for related trades
The same billing questions come up next door. These four guides cover the trades closest to painters and decorators, and each one sits alongside its own free template.
Every trade has one: see all 46 invoicing guides, or go straight to the 46 free invoice templates they describe.
Everything on this site, set up for painters and decorators
The whole toolkit, with the reason each one matters to painters and decorators rather than in general. The five marked links open with painting contractor already selected.
Make the document on site
Five of these arrive with painting contractor already selected, so the first line is surface preparation and filling rather than an empty row.
- Invoice Generatoropens set to this trade. The painting contractor invoice this guide describes, priced and ready to edit.
- Quote Generatoropens set to this trade. Quote first: always, with the preparation itemized. Converts to the invoice without retyping.
- Receipt MakerRecords a payment on the day and prints the balance still owed on the job.
- Recurring InvoicesFor painters and decorators billing the same client on the same day every month.
- Purchase OrderOrder materials from the merchant on a numbered document they can match.
- Work OrderSend a second pair of hands to a job with the scope written down first.
- Cost Estimatoropens set to this trade. Build the job up from materials, labor and margin before you quote it.
Templates you can take to the job
The same painting contractor lines, in whatever file the person paying you expects.
- Painting contractor invoice templateThe template this guide is written about, with the painting contractor lines already on it.
- 200 invoice designsopens set to this trade. Put those lines in any of 200 designs and keep the one you like.
- 72 Word templatesEdit offline, or send a file a client can fill in themselves.
- 72 Excel templatesThe totals calculate themselves, which matters on a long line list.
- 72 fillable PDFsType into the fields and print, with nothing to install.
- Google Docs templatesCopy to your own Drive and edit from a phone.
- Google Sheets templatesSame totals, shared with whoever does your books.
- Blank invoice templatesA plain document for the job that does not fit any list you have.
- Quote templatesA priced quote on paper, for a client who wants the figure before the work.
- Estimate templatesA figure that is explicitly not a fixed price, on a job you have not opened up yet.
- Receipt templatesProof of payment for a client who needs it for their own records.
- Work order templatesThe scope, the site and the authorisation, before anybody drives out.
Work out the number first
This guide is about the document. These are for deciding what goes on it.
- Markup CalculatorTurn what a job costs you into the price you charge, without confusing markup with margin.
- Profit Margin CalculatorCheck what is actually left on a painting contractor job once materials and time are paid for.
- Break-Even CalculatorWork out how many jobs a month cover your costs before anything is profit.
- Service Price CalculatorPrice a service against your own costs rather than against what somebody else charges.
- Sales Tax CalculatorAdd or strip tax on a figure before it goes on the invoice.
- Invoice CalculatorTotal up lines, tax and a deposit before you commit them to the document.
- Paint CalculatorGallons and coats for an area, so the paint line matches what you actually buy.
Get it paid before you are on the next job
Terms of 14 days is the shape this guide assumes. Deposit: on larger jobs, covering the paint.
- Payment links and QR codesA link and a scannable code on the invoice, so paying is a tap.
- Late fee calculatoropens set to this trade. Works out what your own terms allow and writes the chasing letter.
- Payment terms guideWhich terms actually get invoices paid, and the exact wording to use.
- Deposit invoicesWhen to ask, how much, and how the final invoice shows the balance.
- Chasing an unpaid invoiceThe reminder, the call, the overdue notice, then what comes after.
- Progress billingBilling a long job in stages so you are not funding it yourself.
- Invoice numberingA numbering system that never repeats and never skips.
- Change ordersPricing extra work in a way the customer has already agreed to.
Read next
- All 46 invoicing guidesThe same guide, written for every other trade on the site.
- 46 trade invoice templatesEvery trade, each opening with its own lines already priced.
- Invoicing glossaryPlain definitions of the words on an invoice, a quote and a job.
- The blogLonger pieces on quoting, billing, tax and getting paid.
- All 24 toolsEverything on the site in one list, including the ones not named here.