The short version
Roof repairs are measured in squares, one square being 100 square feet of roof. Describe where the problem is, list the area to repair, name the flashing and sealant used and keep labor as crew hours.
Open the work order generator for roofing jobsWhat to put on a roofing work order
- Where the problem is. Slope, side of the house and the feature nearby, for example a vent pipe, a chimney or a valley.
- Area in squares. A square is 100 sq ft. Write the area to repair in squares, so the shingle line has a quantity and a rate.
- Flashing and sealant. Pipe boots, step flashing and sealant each go on a line, with the material named.
- Safety and access. Ladder or lift, whether the customer needs to move vehicles, and any tarp or interior protection you will use.
- Weather condition. Write that the visit depends on dry weather, and give the day it moves to if it is postponed.
- Sign-off on completion. The customer signs once the work is done, with photos taken before and after kept in your own file.
Roofing work order example
The job: leak at the kitchen vent pipe. Scheduled for Tuesday, dry weather only, and assigned to your own crew lead. Each line has a unit, a quantity and a rate. Use your own rates.
| Line item | Unit | Qty | Rate | Amount |
|---|---|---|---|---|
| Roof inspection and leak trace | job | 1 | $175.00 | $175.00 |
| Shingle repair | square | 0.5 | $360.00 | $180.00 |
| Pipe boot flashing | each | 1 | $45.00 | $45.00 |
| Sealant and fasteners | job | 1 | $28.00 | $28.00 |
| Labor, two roofers | hour | 6 | $60.00 | $360.00 |
| Debris removal | job | 1 | $50.00 | $50.00 |
| Subtotal | $838.00 | |||
| Sales tax at an example rate of 8% on parts and materials only | $5.84 | |||
| Work order total | $843.84 | |||
Parts and materials of $73.00 carry the tax placeholder. Check what your state taxes before you use a rate.
Roofing fields worth filling in
| Field | What to write |
|---|---|
| Job site | Address and the roof area, such as rear slope above the kitchen. |
| Access notes | Ladder placement, vehicles to move, pets, a gate. |
| Scheduled for | The day, with a note that the visit depends on dry weather. |
| Job or cost code | Your own job number, or the insurance claim number when the work is part of a claim. |
| Terms of this work order | What the repair covers and what it does not, such as hidden decking damage. |
When the roofing job changes
If the roofer lifts shingles and finds rotted decking, stop and write the decking as a new line or a new sheet before going on. The customer sees the added square footage and signs it, and the first sheet stays the record of the leak repair.
Roofing work order questions
What does a roofing work order need that other trades do not?
An area measured in squares, a named flashing, and a note about weather. The example repairs half a square of shingles at $360.00, which is $180.00, and replaces one pipe boot.
How do I price a small repair in squares?
Use a fraction of a square and the rate per square. One square is 100 sq ft, so half a square is 50 sq ft, as in the example. Many roofers also add a minimum charge, which you can show as its own line.
What does the example roofing work order come to?
Inspection, shingles, labor and debris removal add up to $765.00. The pipe boot and sealant of $73.00 are taxed at an 8% placeholder for $5.84. The subtotal is $838.00 and the total is $843.84. Use your own rates and tax rule.
What if bad decking is found under the shingles?
Stop and write it up as a new line or a new work order before the crew goes on. Write the extra area and price, and get the customer’s signature on the new lines.
Do I need an account to download the roofing work order?
No. The work order generator lets you fill in, print and download without an account. Opening a gallery design in the editor needs a free account.
Work order, estimate and invoice for roofing jobs
A roofing work order is written once the customer says yes. The estimate or quote carries the price, the work order carries the scope to the site, and the invoice follows once the customer has signed off. Start from the roofing estimate template or the roofing quote template, then bill the finished job with the roofer invoice template.
Start your roofing work order
Open the work order generator for roofing jobsWork order templates for other trades
- HVAC work order template: no cooling, second floor unit
- Plumbing work order template: leak at water heater drain valve
- Electrical work order template: replace two kitchen receptacles with GFCI and add one dedicated outlet
- All work order templates, including the 30+ designs