The short version
Roofing invoices carry two costs no other trade has in the same way: getting up there safely, and getting the old roof away. Both are real money, both are invisible from the ground, and both need to be named lines rather than hidden inside a total.
What goes on a roofer invoice
Six things, in the order they belong on the page. The invoice generator opens a roofer document with the lines already in place, so most of this is checking rather than typing.
- Bill access separately. Scaffolding, towers and edge protection are a cost per week, not part of your labor rate.
- Separate the strip and disposal. Taking a roof off and skipping it is a job in itself and it should be priced as one.
- Price the covering by area with the rate showing. Square meters at a rate is checkable. A single figure for a roof is not.
- Name the material and the specification. Tile, slate or membrane, and which. The guarantee depends on it and so does any future repair.
- Put the guarantee on the invoice. Roofing is bought on the guarantee. If it is not written down, it does not exist.
- State how weather delays are handled. Standing time on a scaffold you are paying for is a cost that has to fall somewhere.
The lines a roofer invoice usually carries
These are the lines the generator opens with when you pick Roofer. The figures are a starting point to type over rather than a going rate: this site runs no pricing survey, and the number on your invoice should be the one you charge.
| Line | What it covers | Qty | Opens at |
|---|---|---|---|
| Roof inspection and report | Inspect the covering, flashings and gutters, and report on what needs doing with photographs. | 1 | $120 |
| Tile or shingle replacement | Replace the damaged units, re-bed or re-fix as needed and match the existing covering as closely as possible. | 1 | $480 |
| Flashing and sealing repair | Renew flashings at abutments and penetrations and seal the joints so water runs off rather than in. | 1 | $260 |
| Scaffolding rental | Erect, rent and strike the access needed to work safely at height, for the period of the job. | 1 | $350 |
Add, rename, reorder or delete any line, and set tax per line where it applies. Priced as they open, that comes to $1,210 before tax.
A worked roofer invoice, filled in
This is the same job as the table above, written out the way it would leave your phone. Every figure on it is a starting point rather than a going rate, and the tax line is shown at ten per cent purely so the arithmetic is visible: set your own rate, or none, per line.
INVOICE
Bill to
Your client name
Client address
Work carried out at
Job address
Job or order reference
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Roof inspection and report | 1 | $120 | $120 |
| Tile or shingle replacement | 1 | $480 | $480 |
| Flashing and sealing repair | 1 | $260 | $260 |
| Scaffolding rental | 1 | $350 | $350 |
| Subtotal | $1,210 |
| Tax at 10% | $121 |
| Total due | $1,331 |
Late payment. State your own rate and when it starts, so it is agreed before the due date rather than argued after it.
Subtotal $1,210, tax $121, total $1,331. The parts worth copying are the structure rather than the numbers: the job reference next to the client, every line separately priced with its count showing, the tax on its own line, and terms that name a number of days instead of saying on receipt.
Access, scaffolding and the cost the customer cannot see
A customer comparing two roofing quotes is usually comparing one that includes scaffolding with one that does not, and they cannot tell which is which from the totals.
Put access on the invoice as its own line, with the rental period stated. If it is your scaffold, price it per week. If it is rented in, say so, because a longer job then visibly costs more in access and the customer understands why.
This is also the line that protects you when a job overruns for reasons outside your control. Extra weeks of scaffold are a stated unit cost rather than a renegotiation.
Repair against replacement, and being honest about which one this is
Roofing is the trade most exposed to a customer feeling they were talked into more work than they needed, and the invoice is where that impression forms.
On a repair, say what failed and what you did: the number of tiles, the length of flashing, the section of ridge. On a replacement, break the roof into strip, structure, membrane, battens, covering and detail, so the customer can see the difference between the two jobs rather than only the difference in price.
Where you found something worse once the covering was off, that is a variation with its own line and, ideally, a photograph. Nothing on a roofing invoice is verifiable by the person paying for it unless you make it so.
Insurance work and the invoice the insurer will actually accept
Storm damage work is paid by an insurer, and an insurer pays against a document written for them rather than for the homeowner.
That means the claim reference on the invoice, the property address, the date of damage where you know it, a description that separates storm damage from pre-existing wear, and the scope broken into items rather than a single repair figure.
Keep the wording factual. An insurer reading condition described as poor will look for a reason not to pay, while an insurer reading three ridge tiles displaced and bedding failed on the south elevation has something to settle against.
Hourly, fixed price or per unit: how roofers price the work
Roofing is priced by area for the covering and by the item for everything else, and the everything else is where the money is. Access, strip, disposal and detail work are all real costs a customer cannot see from the street, and none of them belong inside a rate per square foot.
| Model | Where it wins | What it quietly costs you |
|---|---|---|
| Per square foot | The covering itself, on any roof you can measure | It says nothing about pitch, access or condition, all of which change the hours |
| Fixed price per job | Full replacements, where the customer wants one number and a guarantee | What is under the covering is unknown until it is off, so the variation wording matters |
| Day rate plus materials | Repairs, storm damage, chasing a leak nobody has found | Hard to sell against a fixed quote, so it needs a not-to-exceed figure |
Access is the line that decides whether your quote looks competitive or expensive, so state it separately with the rental period. A customer comparing two roofing prices is usually comparing one with scaffolding in it against one without, and only your invoice tells them which is which.
Working out what to charge
This guide is about what goes on the document, not what the number should be, and nobody should hand you a rate for your own market. What the site can do is the arithmetic: the freelance rate calculator works back from what you need to earn, the service price calculator prices a service against your costs, and the profit margin calculator checks what is left once the job is done.
Writing it on your phone, in five steps
Most roofers write the invoice standing next to the work rather than at a desk a week later, and the week later version is the one that gets details wrong. The generator is built for the first case.
- Open it with your trade already chosen. The roofer invoice loads with roof inspection and report and the rest of the lines already on the page.
- Put the client and the job reference in first. It is the part you will not remember accurately in three days, and on agent, landlord or contractor work it is the reason the invoice gets paid at all.
- Edit the lines rather than starting from empty. Change the quantities and the rates, delete what you did not do, add what you did. Keeping the descriptions means the wording stays consistent from one job to the next.
- Set the terms to 14 days and add a payment link. A due date that is an actual date gets chased. A link and a QR code means it can be settled before you have packed up.
- Send it before you leave. The clock on your terms starts when the invoice arrives, not when the work finished, so every day it sits unsent is a day added to getting paid.
Getting paid once it is sent
Put a due date and your terms on the document, because an invoice without them is hard to chase. Add a payment link and a QR so settling up is a tap rather than a transfer somebody has to set up. When part of it lands, the receipt maker records it as a part payment and prints the balance still due. If the due date passes, the late fee calculator works out what your own terms allow and writes the chasing letter to go with it.
Five dates decide whether a roofer gets paid on time, and four of them are set before the work starts.
Mistakes that cost roofers money
- Scaffolding inside the total. Your quote looks expensive against one that leaves access out.
- Strip and disposal unbilled. A skip and a day of labor absorbed on every reroof.
- Material specification missing. No guarantee trail and no way to match on a future repair.
- Guarantee mentioned but not written. The one thing the customer bought does not appear on the document.
- Insurance invoice written for the homeowner. No claim reference, so it sits in a queue.
Roofer invoice questions
How do I write a roofing invoice?
Bill access and scaffolding as their own line, separate the strip and disposal, price the covering by area with the rate showing, name the material specification, and put the guarantee in writing. The generator opens a roofing invoice with access, strip, covering and disposal already listed.
Should scaffolding be a separate line?
Yes. It is a real cost with a rental period, and stating it is what lets a customer compare your price fairly against a quote that excluded access.
How do I price a roof?
Most roofers price the covering by square foot with separate lines for access, strip and disposal, flashings and detail work. Showing the area and the rate makes the figure checkable rather than something the customer has to accept.
How do I invoice for insurance work?
Put the claim reference and the property on the invoice, describe the damage factually, separate storm damage from existing wear, and itemize the scope. Insurers settle against detail, not against a single repair total.
What about weather delays?
State in your terms how standing time and extended access equipment rental are handled. On a scaffolded job the cost of a delay is real, and it needs to be agreed before the weather rather than after it.
Should the guarantee go on the invoice?
Yes. Roofing is bought on the guarantee, and a guarantee that exists only in conversation is worth nothing to either of you. State the period and what it covers.
What should a roofing invoice include?
Your details and the customer, the property, access, strip and disposal, the covering by area with the material named, flashings and detail, any variations found once stripped, the total, the guarantee and your terms.
Free roofer invoice template
The free roofer invoice template opens with the lines above already priced, in any of 200 designs, and exports a print-ready PDF with no signup and nothing saved to a server. If you would rather edit a file offline, there are 72 Word templates, 72 Excel templates with the totals already calculating, and 72 fillable PDFs.
Invoicing guides for related trades
The same billing questions come up next door. These four guides cover the trades closest to roofers, and each one sits alongside its own free template.
Every trade has one: see all 46 invoicing guides, or go straight to the 46 free invoice templates they describe.
Everything on this site, set up for roofers
The whole toolkit, with the reason each one matters to roofers rather than in general. The five marked links open with roofer already selected.
Make the document on site
Five of these arrive with roofer already selected, so the first line is roof inspection and report rather than an empty row.
- Invoice Generatoropens set to this trade. The roofer invoice this guide describes, priced and ready to edit.
- Quote Generatoropens set to this trade. Quote first: always, with access priced separately. Converts to the invoice without retyping.
- Receipt MakerRecords a payment on the day and prints the balance still owed on the job.
- Recurring InvoicesFor roofers billing the same client on the same day every month.
- Purchase OrderOrder materials from the merchant on a numbered document they can match.
- Work OrderSend a second pair of hands to a job with the scope written down first.
- Cost Estimatoropens set to this trade. Build the job up from materials, labor and margin before you quote it.
Templates you can take to the job
The same roofer lines, in whatever file the person paying you expects.
- Roofer invoice templateThe template this guide is written about, with the roofer lines already on it.
- 200 invoice designsopens set to this trade. Put those lines in any of 200 designs and keep the one you like.
- 72 Word templatesEdit offline, or send a file a client can fill in themselves.
- 72 Excel templatesThe totals calculate themselves, which matters on a long line list.
- 72 fillable PDFsType into the fields and print, with nothing to install.
- Google Docs templatesCopy to your own Drive and edit from a phone.
- Google Sheets templatesSame totals, shared with whoever does your books.
- Blank invoice templatesA plain document for the job that does not fit any list you have.
- Quote templatesA priced quote on paper, for a client who wants the figure before the work.
- Estimate templatesA figure that is explicitly not a fixed price, on a job you have not opened up yet.
- Receipt templatesProof of payment for a client who needs it for their own records.
- Work order templatesThe scope, the site and the authorisation, before anybody drives out.
Work out the number first
This guide is about the document. These are for deciding what goes on it.
- Markup CalculatorTurn what a job costs you into the price you charge, without confusing markup with margin.
- Profit Margin CalculatorCheck what is actually left on a roofer job once materials and time are paid for.
- Break-Even CalculatorWork out how many jobs a month cover your costs before anything is profit.
- Service Price CalculatorPrice a service against your own costs rather than against what somebody else charges.
- Sales Tax CalculatorAdd or strip tax on a figure before it goes on the invoice.
- Invoice CalculatorTotal up lines, tax and a deposit before you commit them to the document.
Get it paid before you are on the next job
Terms of 14 days is the shape this guide assumes. Deposit: on reroofs, covering materials and access equipment rental.
- Payment links and QR codesA link and a scannable code on the invoice, so paying is a tap.
- Late fee calculatoropens set to this trade. Works out what your own terms allow and writes the chasing letter.
- Payment terms guideWhich terms actually get invoices paid, and the exact wording to use.
- Deposit invoicesWhen to ask, how much, and how the final invoice shows the balance.
- Chasing an unpaid invoiceThe reminder, the call, the overdue notice, then what comes after.
- Progress billingBilling a long job in stages so you are not funding it yourself.
- Invoice numberingA numbering system that never repeats and never skips.
- Change ordersPricing extra work in a way the customer has already agreed to.
Read next
- All 46 invoicing guidesThe same guide, written for every other trade on the site.
- 46 trade invoice templatesEvery trade, each opening with its own lines already priced.
- Invoicing glossaryPlain definitions of the words on an invoice, a quote and a job.
- The blogLonger pieces on quoting, billing, tax and getting paid.
- All 24 toolsEverything on the site in one list, including the ones not named here.