InvoiceTools

Home/Guides

How to write a roofer invoice

Roofing invoices carry two costs no other trade has in the same way: getting up there safely, and getting the old roof away.

The free roofer invoice template opens with these lines already in place.

The short version

Roofing invoices carry two costs no other trade has in the same way: getting up there safely, and getting the old roof away. Both are real money, both are invisible from the ground, and both need to be named lines rather than hidden inside a total.

What goes on a roofer invoice

Six things, in the order they belong on the page. The invoice generator opens a roofer document with the lines already in place, so most of this is checking rather than typing.

  1. Bill access separately. Scaffolding, towers and edge protection are a cost per week, not part of your labor rate.
  2. Separate the strip and disposal. Taking a roof off and skipping it is a job in itself and it should be priced as one.
  3. Price the covering by area with the rate showing. Square meters at a rate is checkable. A single figure for a roof is not.
  4. Name the material and the specification. Tile, slate or membrane, and which. The guarantee depends on it and so does any future repair.
  5. Put the guarantee on the invoice. Roofing is bought on the guarantee. If it is not written down, it does not exist.
  6. State how weather delays are handled. Standing time on a scaffold you are paying for is a cost that has to fall somewhere.

The lines a roofer invoice usually carries

These are the lines the generator opens with when you pick Roofer. The figures are a starting point to type over rather than a going rate: this site runs no pricing survey, and the number on your invoice should be the one you charge.

LineWhat it coversQtyOpens at
Roof inspection and reportInspect the covering, flashings and gutters, and report on what needs doing with photographs.1$120
Tile or shingle replacementReplace the damaged units, re-bed or re-fix as needed and match the existing covering as closely as possible.1$480
Flashing and sealing repairRenew flashings at abutments and penetrations and seal the joints so water runs off rather than in.1$260
Scaffolding rentalErect, rent and strike the access needed to work safely at height, for the period of the job.1$350

Add, rename, reorder or delete any line, and set tax per line where it applies. Priced as they open, that comes to $1,210 before tax.

A worked roofer invoice, filled in

This is the same job as the table above, written out the way it would leave your phone. Every figure on it is a starting point rather than a going rate, and the tax line is shown at ten per cent purely so the arithmetic is visible: set your own rate, or none, per line.

INVOICE

INV-2026-029
Issued 3 September 2026
Due 14 days from issue
Roofer
Your business name
Your address
Your phone and email

Bill to

Your client name
Client address

Work carried out at

Job address
Job or order reference

DescriptionQtyRateAmount
Roof inspection and report1$120$120
Tile or shingle replacement1$480$480
Flashing and sealing repair1$260$260
Scaffolding rental1$350$350
Subtotal$1,210
Tax at 10%$121
Total due$1,331
Payment terms. Payable within 14 days of the invoice date. Bank details, or a payment link and QR the client can scan.
Late payment. State your own rate and when it starts, so it is agreed before the due date rather than argued after it.

Subtotal $1,210, tax $121, total $1,331. The parts worth copying are the structure rather than the numbers: the job reference next to the client, every line separately priced with its count showing, the tax on its own line, and terms that name a number of days instead of saying on receipt.

Access, scaffolding and the cost the customer cannot see

A customer comparing two roofing quotes is usually comparing one that includes scaffolding with one that does not, and they cannot tell which is which from the totals.

Put access on the invoice as its own line, with the rental period stated. If it is your scaffold, price it per week. If it is rented in, say so, because a longer job then visibly costs more in access and the customer understands why.

This is also the line that protects you when a job overruns for reasons outside your control. Extra weeks of scaffold are a stated unit cost rather than a renegotiation.

Repair against replacement, and being honest about which one this is

Roofing is the trade most exposed to a customer feeling they were talked into more work than they needed, and the invoice is where that impression forms.

On a repair, say what failed and what you did: the number of tiles, the length of flashing, the section of ridge. On a replacement, break the roof into strip, structure, membrane, battens, covering and detail, so the customer can see the difference between the two jobs rather than only the difference in price.

Where you found something worse once the covering was off, that is a variation with its own line and, ideally, a photograph. Nothing on a roofing invoice is verifiable by the person paying for it unless you make it so.

Insurance work and the invoice the insurer will actually accept

Storm damage work is paid by an insurer, and an insurer pays against a document written for them rather than for the homeowner.

That means the claim reference on the invoice, the property address, the date of damage where you know it, a description that separates storm damage from pre-existing wear, and the scope broken into items rather than a single repair figure.

Keep the wording factual. An insurer reading condition described as poor will look for a reason not to pay, while an insurer reading three ridge tiles displaced and bedding failed on the south elevation has something to settle against.

Hourly, fixed price or per unit: how roofers price the work

Roofing is priced by area for the covering and by the item for everything else, and the everything else is where the money is. Access, strip, disposal and detail work are all real costs a customer cannot see from the street, and none of them belong inside a rate per square foot.

ModelWhere it winsWhat it quietly costs you
Per square footThe covering itself, on any roof you can measureIt says nothing about pitch, access or condition, all of which change the hours
Fixed price per jobFull replacements, where the customer wants one number and a guaranteeWhat is under the covering is unknown until it is off, so the variation wording matters
Day rate plus materialsRepairs, storm damage, chasing a leak nobody has foundHard to sell against a fixed quote, so it needs a not-to-exceed figure

Access is the line that decides whether your quote looks competitive or expensive, so state it separately with the rental period. A customer comparing two roofing prices is usually comparing one with scaffolding in it against one without, and only your invoice tells them which is which.

Working out what to charge

This guide is about what goes on the document, not what the number should be, and nobody should hand you a rate for your own market. What the site can do is the arithmetic: the freelance rate calculator works back from what you need to earn, the service price calculator prices a service against your costs, and the profit margin calculator checks what is left once the job is done.

Writing it on your phone, in five steps

Most roofers write the invoice standing next to the work rather than at a desk a week later, and the week later version is the one that gets details wrong. The generator is built for the first case.

  1. Open it with your trade already chosen. The roofer invoice loads with roof inspection and report and the rest of the lines already on the page.
  2. Put the client and the job reference in first. It is the part you will not remember accurately in three days, and on agent, landlord or contractor work it is the reason the invoice gets paid at all.
  3. Edit the lines rather than starting from empty. Change the quantities and the rates, delete what you did not do, add what you did. Keeping the descriptions means the wording stays consistent from one job to the next.
  4. Set the terms to 14 days and add a payment link. A due date that is an actual date gets chased. A link and a QR code means it can be settled before you have packed up.
  5. Send it before you leave. The clock on your terms starts when the invoice arrives, not when the work finished, so every day it sits unsent is a day added to getting paid.

Getting paid once it is sent

Put a due date and your terms on the document, because an invoice without them is hard to chase. Add a payment link and a QR so settling up is a tap rather than a transfer somebody has to set up. When part of it lands, the receipt maker records it as a part payment and prints the balance still due. If the due date passes, the late fee calculator works out what your own terms allow and writes the chasing letter to go with it.

QuoteDepositInvoiceDue day 14Chase day 21
Quote: Always, with access priced separatelyDeposit: On reroofs, covering materials and access equipment rentalInvoice: Sent the day the work finishesDue day 14: The date printed on the documentChase day 21: Reminder, then your late fee

Five dates decide whether a roofer gets paid on time, and four of them are set before the work starts.

Mistakes that cost roofers money

  • Scaffolding inside the total. Your quote looks expensive against one that leaves access out.
  • Strip and disposal unbilled. A skip and a day of labor absorbed on every reroof.
  • Material specification missing. No guarantee trail and no way to match on a future repair.
  • Guarantee mentioned but not written. The one thing the customer bought does not appear on the document.
  • Insurance invoice written for the homeowner. No claim reference, so it sits in a queue.

Roofer invoice questions

How do I write a roofing invoice?

Bill access and scaffolding as their own line, separate the strip and disposal, price the covering by area with the rate showing, name the material specification, and put the guarantee in writing. The generator opens a roofing invoice with access, strip, covering and disposal already listed.

Should scaffolding be a separate line?

Yes. It is a real cost with a rental period, and stating it is what lets a customer compare your price fairly against a quote that excluded access.

How do I price a roof?

Most roofers price the covering by square foot with separate lines for access, strip and disposal, flashings and detail work. Showing the area and the rate makes the figure checkable rather than something the customer has to accept.

How do I invoice for insurance work?

Put the claim reference and the property on the invoice, describe the damage factually, separate storm damage from existing wear, and itemize the scope. Insurers settle against detail, not against a single repair total.

What about weather delays?

State in your terms how standing time and extended access equipment rental are handled. On a scaffolded job the cost of a delay is real, and it needs to be agreed before the weather rather than after it.

Should the guarantee go on the invoice?

Yes. Roofing is bought on the guarantee, and a guarantee that exists only in conversation is worth nothing to either of you. State the period and what it covers.

What should a roofing invoice include?

Your details and the customer, the property, access, strip and disposal, the covering by area with the material named, flashings and detail, any variations found once stripped, the total, the guarantee and your terms.

Free roofer invoice template

The free roofer invoice template opens with the lines above already priced, in any of 200 designs, and exports a print-ready PDF with no signup and nothing saved to a server. If you would rather edit a file offline, there are 72 Word templates, 72 Excel templates with the totals already calculating, and 72 fillable PDFs.

The same billing questions come up next door. These four guides cover the trades closest to roofers, and each one sits alongside its own free template.

Every trade has one: see all 46 invoicing guides, or go straight to the 46 free invoice templates they describe.

Everything on this site, set up for roofers

The whole toolkit, with the reason each one matters to roofers rather than in general. The five marked links open with roofer already selected.

Make the document on site

Five of these arrive with roofer already selected, so the first line is roof inspection and report rather than an empty row.

Templates you can take to the job

The same roofer lines, in whatever file the person paying you expects.

Work out the number first

This guide is about the document. These are for deciding what goes on it.

Get it paid before you are on the next job

Terms of 14 days is the shape this guide assumes. Deposit: on reroofs, covering materials and access equipment rental.

Read next