InvoiceTools
A carpenter measures a shelf inside a new plywood cabinet

For carpenters & joiners

Free carpenter invoice and estimate templatesFrom cut list
to a clear invoice.

Turn your measurements, materials and labor
into a professional invoice, so your craftsmanship
gets the recognition it deserves.

Create a carpenter invoice

Simple tools. Solid work.

Cover every detail

A complete joinery scope.

From bespoke cabinetry to finishing touches, your invoice can
clearly list everything included in the job.

  • Cabinetry kitchens, wardrobes, vanities, shelving
  • Installation on-site fitting and adjustments
  • Trim baseboards, casings, moldings
  • Hardware hinges, handles, runners, fixings
  • Labor detailed, transparent breakdown

Professional templates

Ready to use. Easy to customize.

Clean. Professional. Yours.

Customize in minutes. Make it yours.

All 10 carpenter invoice designs

Get paid your way

Share your invoice.
Get paid.

Include your preferred payment details on your invoice
so clients can pay you directly.

Your payment method

Add your bank details, card details
or preferred payment method.
It's your business, your choice.

Same craft.
Faster payment.

Common questions

Frequently asked questions.

Straight answers. Less hassle.

Can I customize the templates?

Yes. All templates are fully editable so you can add your logo, change details and make them your own.

Are the calculators easy to use?

Yes. Our calculators are simple and built for real-world carpentry and joinery work.

Can I include materials and labor?

Absolutely. You can itemize materials, hardware and labor with clear pricing.

More carpenter invoicing questions

What should a carpenter invoice include?

Name the pieces you built and the counts you installed: doors hung, linear feet of trim, days on site. Add the wood and finish used, materials with any markup, and approved extras with their dates. Where your state licenses this kind of work, print the license number with the job address.

How much should I charge for a custom cabinetry build?

It comes down to the size of the run, the material (paint-grade plywood or solid hardwood), door style, drawer count, hardware and finish, and whether you spray in the shop or on site. Access and scribing to out-of-square walls add time too. The generator opens that line at $1,450 so the page is not empty; type your own figure from your estimate.

Should I price cabinetry as one figure or as parts?

One figure for the build, because it is known work against drawings, and breaking it into hours invites a debate about how long each box took. Door hanging and trim sit on separate lines at their own units, per door and per linear foot, so if the count changes on site the total changes by arithmetic rather than by a new quote.

Should I take a deposit before building cabinets?

For custom work many carpenters do, because lumber, sheet goods and hardware are bought before the first cut and a built cabinet cannot be sold to anyone else. Size the deposit around the materials order, send it as its own invoice, and show it as paid on the final bill. Some states limit deposits on home improvement contracts, so check your state's rules.

What can I do if a carpentry invoice goes unpaid?

Send a statement with the due date and agreed terms, then call. Cabinets and trim fixed to a house cannot be taken back, but carpenters who improve real property usually have mechanics lien rights, subject to notice steps and deadlines that vary by state. Some of those deadlines start before the job ends, so learn your state's rules at the start of a job rather than when the money is late.

Do I charge sales tax on carpentry work?

It depends on the state. Some tax labor on repairs but not on capital improvements such as new built-in cabinets, some tax only the materials, and some treat you as the end user who pays tax when buying the lumber. Put materials and labor on separate lines so each can carry the right rate, and check with your state revenue department.

How do I bill extras added during the job?

Write each extra up as a change order before you do it: what changed, the added material and time, and the new price, approved in writing, even by text or email. On the final invoice list it as its own dated line. A client who sees an unexplained higher total argues; one who sees the extra they approved last week usually pays.

How do I show allowances for hardware or finishes?

Put each allowance on its own line with the amount allowed, for example hardware at $500, and note that choices above it are billed as a change. The client sees what is included before they pick.

Can I give the client a receipt for a deposit?

Yes. Make a receipt for the deposit with the project name and the amount received, and show the deposit as paid on the final invoice so the balance is clear.

A carpenter checks a handwritten cut list beside timber samples and a coffee mug

Turn your work into a professional invoice

From measurements
to payment, with less admin.

Create a carpenter invoice

Get organized. Keep building.

Fields for carpenter jobs

  • Dimensions
  • Wood species
  • Finish
  • Hardware
  • Allowances
  • Site notes
  • Change notes
  • Labor hours

What to include in a carpenter invoice

  • Labor days and rate. Days or hours worked and your rate as two separate figures, so a client checking the total against the time you were on site can do the math.
  • Wood species and finish. The species, sheet material, finish and number of coats, because on custom work the specification is what the client agreed to pay for.
  • Door and trim counts. The number of doors hung and the linear feet of trim or baseboard installed, measured on site, so a changed count is arithmetic rather than a new quote.
  • Materials and hardware. Lumber, plywood, hinges, pulls and fasteners on their own lines, at cost or with a stated markup, kept apart from your labor figure.
  • Drawings or scope reference. The drawing or scope you built to, so an added drawer bank or a taller pantry is clearly outside the agreed price.
  • Change orders. Each extra agreed during the job, like a moved opening or upgraded hardware, listed with its date and price rather than folded into the total.
  • Deposit received. The materials deposit already paid, shown as a deduction, so the balance due matches what the client expects to owe at the end. For example, a built-in bookcase priced at 72" wide by 84" tall in paint-grade plywood with a $300 hardware allowance might total $2,400, with a $800 deposit already paid, for an illustrative balance due of $1,600; the deposit lowers the balance, not the price of the work itself.
  • License number and job address. Your contractor license or registration number where your state requires one, plus the address of the property where the work was installed.

Made for the way carpenters work

  • The lines a job always starts with

    Cabinetry, door hanging by the door, trim by the foot, labor by the day. Pick carpenter and they are already priced on the page.

  • Lumber, finish and coats on the paper

    Oak or ash, sprayed or brushed, two coats or three. On the invoice it is a specification; in your head it is a disagreement waiting.

  • Photograph the run, sign the scope

    A picture of the fitted run and a signature on what was agreed settles the extras conversation before it starts.

  • Paid before you sweep up

    Card link and QR on the invoice, so the client pays while you are loading tools rather than a week later.

  • Repeat builder work bills itself

    Same builder, same figure, every unit. Set it recurring and stop raising forty identical invoices.

  • The estimate becomes the invoice

    You priced the kitchen before the first cut. When it is in, the same lines carry across unchanged.