The short version
Carpentry prices in more units than almost any trade: per door, per linear foot, per day, per job. The invoice works when it repeats whichever unit was quoted, and gets queried whenever it does not.
What goes on a carpenter invoice
Six things, in the order they belong on the page. The invoice generator opens a carpenter / cabinetmaker document with the lines already in place, so most of this is checking rather than typing.
- Invoice in the unit you quoted. Per door, per linear foot, per day or per job. Switching units between quote and invoice is the fastest way to get a bill questioned.
- Show the count. Four doors reads as four doors. A single figure invites the customer to test it against a rate they half remember.
- Price lumber and materials separately. Timber prices move constantly. Priced apart, a rise is a rate edit rather than a renegotiation of your labor.
- Allow for waste and say so. Cutting loss on trim and boards is real. A stated allowance is honest; a padded quantity is discovered.
- Separate supply from fit. Supplying a kitchen and fitting it are different commitments with different risk.
- Note the finish position. Whether painting, staining or sealing is included, because customers assume it is.
The lines a carpenter invoice usually carries
These are the lines the generator opens with when you pick Carpenter / cabinetmaker. The figures are a starting point to type over rather than a going rate: this site runs no pricing survey, and the number on your invoice should be the one you charge.
| Line | What it covers | Qty | Opens at |
|---|---|---|---|
| Custom cabinetry build | Measure, build and fit cabinetry to the agreed drawings, including carcasses, doors and hardware. | 1 | $1,450 |
| Door hanging (per door) | Hang each door to the existing or new frame, fit hinges and furniture, and adjust for a clean, even gap. | 3 | $85 |
| Trim and baseboard (per linear foot) | Cut, scribe and fix baseboard or trim, miter the corners and fill the fastener holes ready for paint. | 60 | $4.20 |
| Labor (per day) | Bench and site work charged by the day, including setting out and final adjustment. | 2 | $280 |
Add, rename, reorder or delete any line, and set tax per line where it applies. Priced as they open, that comes to $2,517 before tax.
A worked carpenter invoice, filled in
This is the same job as the table above, written out the way it would leave your phone. Every figure on it is a starting point rather than a going rate, and the tax line is shown at ten per cent purely so the arithmetic is visible: set your own rate, or none, per line.
INVOICE
Bill to
Your client name
Client address
Work carried out at
Job address
Job or order reference
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Custom cabinetry build | 1 | $1,450 | $1,450 |
| Door hanging (per door) | 3 | $85 | $255 |
| Trim and baseboard (per linear foot) | 60 | $4.20 | $252 |
| Labor (per day) | 2 | $280 | $560 |
| Subtotal | $2,517 |
| Tax at 10% | $251.70 |
| Total due | $2,768.70 |
Late payment. State your own rate and when it starts, so it is agreed before the due date rather than argued after it.
Subtotal $2,517, tax $251.70, total $2,768.70. The parts worth copying are the structure rather than the numbers: the job reference next to the client, every line separately priced with its count showing, the tax on its own line, and terms that name a number of days instead of saying on receipt.
Per unit or per day, and which one protects you
A day rate bills the time you actually spend and protects you when a job turns out harder than it looked. A per unit price is easier to sell and better when you are fast, and it punishes you when the walls are not square.
Old properties are the deciding factor. Nothing is plumb, nothing is standard, and a per-door price agreed for a new build will lose money in a Victorian terrace. Quote day rate where the substrate is unknown, per unit where it is not.
Whichever you choose, the invoice repeats the quote. A customer who agreed a per-door price and receives a day rate cannot reconcile it, and reconciling it is what they will spend the next week asking you to do.
Timber, waste and the price that moved since you quoted
Timber pricing is volatile in a way that most trades do not have to manage, and a quote given six weeks before a job can be materially wrong by the time you buy.
Two protections, both on paper. Price materials as a separate line so a movement is visibly a materials issue rather than an inflated labor charge. And put a validity period on the quote so the price has a stated shelf life.
On waste, state the allowance rather than hiding it in the quantity. A customer reading ten per cent cutting allowance understands it. A customer who counts the boards and finds more than the room needed does not.
Supply and fit, and the kitchen the customer bought elsewhere
Supply and fit is one job with one point of responsibility. Fitting something the customer bought is a different job with the responsibility split, and the invoice should show that.
Where you supply, the materials line is yours and so is the warranty on them. Where the customer supplies, say on the invoice that goods were fitted as provided and that damage or shortage in customer-supplied items is not your liability.
That single sentence is what stops a missing bracket or a damaged door becoming your problem at your cost, on a job where you never had control of the purchase.
Hourly, fixed price or per unit: how carpenters price the work
Carpentry prices in more units than any other trade, and the unit is usually decided by what the customer is buying rather than by what you prefer. A door is a unit. A staircase is a job. A week of trim-out for a builder is a day rate. All three are correct.
| Model | Where it wins | What it quietly costs you |
|---|---|---|
| Per unit | Doors, windows, trim, kitchens, anything countable | Old properties are never square, and a per-unit price set on new build loses there |
| Per job, fixed | Custom work, staircases, built-in furniture, anything designed | The drawing is the scope, so any change to it is a change to the price |
| Day rate | Trim-out runs, site work, anything a builder is programming | You are paid for time rather than skill, so the fast carpenter earns least |
Repeat the unit you quoted on the invoice, with the count showing. Nearly every carpentry billing dispute is a customer who was quoted per door and invoiced per day, or the reverse, and it costs more in goodwill than the difference was ever worth.
Working out what to charge
This guide is about what goes on the document, not what the number should be, and nobody should hand you a rate for your own market. What the site can do is the arithmetic: the freelance rate calculator works back from what you need to earn, the service price calculator prices a service against your costs, and the profit margin calculator checks what is left once the job is done.
Writing it on your phone, in five steps
Most carpenters write the invoice standing next to the work rather than at a desk a week later, and the week later version is the one that gets details wrong. The generator is built for the first case.
- Open it with your trade already chosen. The carpenter / cabinetmaker invoice loads with custom cabinetry build and the rest of the lines already on the page.
- Put the client and the job reference in first. It is the part you will not remember accurately in three days, and on agent, landlord or contractor work it is the reason the invoice gets paid at all.
- Edit the lines rather than starting from empty. Change the quantities and the rates, delete what you did not do, add what you did. Keeping the descriptions means the wording stays consistent from one job to the next.
- Set the terms to 14 days and add a payment link. A due date that is an actual date gets chased. A link and a QR code means it can be settled before you have packed up.
- Send it before you leave. The clock on your terms starts when the invoice arrives, not when the work finished, so every day it sits unsent is a day added to getting paid.
Getting paid once it is sent
Put a due date and your terms on the document, because an invoice without them is hard to chase. Add a payment link and a QR so settling up is a tap rather than a transfer somebody has to set up. When part of it lands, the receipt maker records it as a part payment and prints the balance still due. If the due date passes, the late fee calculator works out what your own terms allow and writes the chasing letter to go with it.
Five dates decide whether a carpenter gets paid on time, and four of them are set before the work starts.
Mistakes that cost carpenters money
- Changing units between quote and invoice. The customer cannot reconcile it, so they query it.
- Timber inside the labor figure. A price rise looks like you increased your rate.
- Waste hidden in quantities. Stated it is normal, discovered it looks like padding.
- No note on customer-supplied goods. Their damaged door becomes your problem at your cost.
- Finish assumed. Customers assume painting is included unless the invoice says otherwise.
Carpenter / cabinetmaker invoice questions
How do I invoice as a carpenter?
Invoice in the unit you quoted with the count showing, price lumber separately, state any waste allowance, separate supply from installation and note whether finishing is included. The generator opens a carpentry invoice with cabinetry, doors, trim and labor already listed.
Should I charge a day rate or per unit?
Per unit is easier to sell and rewards speed; a day rate protects you when the substrate is unknown. Older properties are the deciding factor, because nothing is square and a per-unit price agreed for new build will lose money there.
How do I handle timber price rises?
Price materials as their own line and put a validity period on your quote. Then a rise is visibly a materials movement rather than something that looks like an increase in your labor rate.
Should I charge for waste?
State the allowance rather than burying it in quantities. A customer reading a ten per cent cutting allowance accepts it; a customer who counts leftover boards and works it out for themselves does not.
What if the customer supplies the materials?
Fit them at your normal rate and put a line on the invoice saying goods were installed as supplied and that shortages or damage in customer-supplied items are not your liability.
What should a carpentry invoice include?
Your business and the customer, the property, an invoice number and date, the work in the unit quoted with counts, lumber and materials separately, waste allowance, whether finishing is included, the total and your terms.
Do I include painting and finishing?
Only if you say so. Customers routinely assume finishing is part of carpentry work, so the invoice should state the position either way.
Free carpenter invoice template
The free carpenter invoice template opens with the lines above already priced, in any of 200 designs, and exports a print-ready PDF with no signup and nothing saved to a server. If you would rather edit a file offline, there are 72 Word templates, 72 Excel templates with the totals already calculating, and 72 fillable PDFs.
Invoicing guides for related trades
The same billing questions come up next door. These four guides cover the trades closest to carpenters, and each one sits alongside its own free template.
Every trade has one: see all 46 invoicing guides, or go straight to the 46 free invoice templates they describe.
Everything on this site, set up for carpenters
The whole toolkit, with the reason each one matters to carpenters rather than in general. The five marked links open with carpenter / cabinetmaker already selected.
Make the document on site
Five of these arrive with carpenter / cabinetmaker already selected, so the first line is custom cabinetry build rather than an empty row.
- Invoice Generatoropens set to this trade. The carpenter invoice this guide describes, priced and ready to edit.
- Quote Generatoropens set to this trade. Quote first: on anything designed or made to measure. Converts to the invoice without retyping.
- Receipt MakerRecords a payment on the day and prints the balance still owed on the job.
- Recurring InvoicesFor carpenters billing the same client on the same day every month.
- Purchase OrderOrder materials from the merchant on a numbered document they can match.
- Work OrderSend a second pair of hands to a job with the scope written down first.
- Cost Estimatoropens set to this trade. Build the job up from materials, labor and margin before you quote it.
Templates you can take to the job
The same carpenter lines, in whatever file the person paying you expects.
- Carpenter / cabinetmaker invoice templateThe template this guide is written about, with the carpenter lines already on it.
- 200 invoice designsopens set to this trade. Put those lines in any of 200 designs and keep the one you like.
- 72 Word templatesEdit offline, or send a file a client can fill in themselves.
- 72 Excel templatesThe totals calculate themselves, which matters on a long line list.
- 72 fillable PDFsType into the fields and print, with nothing to install.
- Google Docs templatesCopy to your own Drive and edit from a phone.
- Google Sheets templatesSame totals, shared with whoever does your books.
- Blank invoice templatesA plain document for the job that does not fit any list you have.
- Quote templatesA priced quote on paper, for a client who wants the figure before the work.
- Estimate templatesA figure that is explicitly not a fixed price, on a job you have not opened up yet.
- Receipt templatesProof of payment for a client who needs it for their own records.
- Work order templatesThe scope, the site and the authorisation, before anybody drives out.
Work out the number first
This guide is about the document. These are for deciding what goes on it.
- Markup CalculatorTurn what a job costs you into the price you charge, without confusing markup with margin.
- Profit Margin CalculatorCheck what is actually left on a carpenter job once materials and time are paid for.
- Break-Even CalculatorWork out how many jobs a month cover your costs before anything is profit.
- Service Price CalculatorPrice a service against your own costs rather than against what somebody else charges.
- Sales Tax CalculatorAdd or strip tax on a figure before it goes on the invoice.
- Invoice CalculatorTotal up lines, tax and a deposit before you commit them to the document.
Get it paid before you are on the next job
Terms of 14 days is the shape this guide assumes. Deposit: on custom work, covering the lumber.
- Payment links and QR codesA link and a scannable code on the invoice, so paying is a tap.
- Late fee calculatoropens set to this trade. Works out what your own terms allow and writes the chasing letter.
- Payment terms guideWhich terms actually get invoices paid, and the exact wording to use.
- Deposit invoicesWhen to ask, how much, and how the final invoice shows the balance.
- Chasing an unpaid invoiceThe reminder, the call, the overdue notice, then what comes after.
- Progress billingBilling a long job in stages so you are not funding it yourself.
- Invoice numberingA numbering system that never repeats and never skips.
- Change ordersPricing extra work in a way the customer has already agreed to.
Read next
- All 46 invoicing guidesThe same guide, written for every other trade on the site.
- 46 trade invoice templatesEvery trade, each opening with its own lines already priced.
- Invoicing glossaryPlain definitions of the words on an invoice, a quote and a job.
- The blogLonger pieces on quoting, billing, tax and getting paid.
- All 24 toolsEverything on the site in one list, including the ones not named here.