How to write a carpenter invoice

By Michael Reed, Licensed general contractor (TX)

Carpentry prices in more units than almost any trade: per door, per linear foot, per day, per job.

The free carpenter invoice template opens with these lines already in place.

The short version

To write a carpentry invoice, bill in the unit you quoted (per door, per linear foot, per day or per piece), show the count on every line, put lumber on its own line with the waste allowance stated, say who supplied what, and note whether the work is left ready for paint.

What goes on a carpenter invoice

Six things, in the order they belong on the page. The invoice generator opens a carpenter / cabinetmaker document with the lines already in place, so most of this is checking rather than typing.

  1. Invoice in the unit you quoted. Per door, per linear foot, per day or per job. Switching units between quote and invoice is the fastest way to get a bill questioned.
  2. Show the count. Four doors reads as four doors. A single figure invites the customer to test it against a rate they half remember.
  3. Price lumber and materials separately. Timber prices move constantly. Priced apart, a rise is a rate edit rather than a renegotiation of your labor.
  4. Allow for waste and say so. Cutting loss on trim and boards is real. A stated allowance is honest; a padded quantity is discovered.
  5. Separate supply from fit. Supplying a kitchen and fitting it are different commitments with different risk.
  6. Note the finish position. Whether painting, staining or sealing is included, because customers assume it is.

The lines a carpenter invoice usually carries

The generator opens with these lines when you pick Carpenter / cabinetmaker. The figures are placeholders to type over, not a going rate.

LineWhat it coversQtyOpens at
Custom cabinetry buildMeasure, build and fit cabinetry to the agreed drawings, including carcasses, doors and hardware.1$1,450
Door hanging (per door)Hang each door to the existing or new frame, fit hinges and furniture, and adjust for a clean, even gap.3$85
Trim and baseboard (per linear foot)Cut, scribe and fix baseboard or trim, miter the corners and fill the fastener holes ready for paint.60$4.20
Labor (per day)Bench and site work charged by the day, including setting out and final adjustment.2$280

Add, rename, reorder or delete any line, and set tax per line where it applies. Priced as they open, that comes to $2,517 before tax.

How to write a carpentry invoice, step by step

  1. Pull out the quote before you open anything. Whatever unit you priced in is the unit the invoice uses. Open the carpenter / cabinetmaker invoice and check that the door count, the footage of trim and the days match what the customer signed, not what you remember.
  2. Measure what you actually fitted. Run the tape along the baseboard you installed and count the doors you hung. If the job came to 64 linear feet against 60 quoted, the invoice shows 64 and a one-line note on why.
  3. Enter lumber from the yard receipts, not the estimate. Price the sheet goods and hardwood at what they cost you this week plus your margin, and state the waste allowance on the line. If the price moved since the quote, say so on the document.
  4. Mark who supplied what. A kitchen bought elsewhere and fitted by you is a labor-only line with the words customer-supplied units. That sentence decides who pays when a carcass arrives damaged.
  5. Write the finish position, then send. Say whether the work is left sanded and ready for paint, primed, or finished. Set 14 days, add a payment link, and send it the day the last door closes cleanly.

Carpentry invoice example, filled in

A kitchen cabinetry job with three doors rehung and the hall trim replaced, written in the units it was quoted in. The trim shows its footage and the doors show their count, so the customer can check both with a tape and their own eyes.

INVOICE

INV-2026-063
Issued 3 September 2026
Due 14 days from issue
Carpenter / cabinetmaker
Your business name
Your address
Your phone and email

Bill to

Kate Morrow
22 Linden Court, Ashford

Work carried out at

Same address, kitchen and hall
Quote Q-2026-041

DescriptionQtyRateAmount
Custom cabinetry build1$1,450$1,450
Door hanging (per door)3$85$255
Trim and baseboard (per linear foot)60$4.20$252
Labor (per day)2$280$560
Subtotal$2,517
Tax at 10%$251.70
Total due$2,768.70
Payment terms. Payable within 14 days of the invoice date. Bank details, or a payment link and QR the client can scan.
Finish. Cabinetry left sanded and ready for paint. Painting is not included.

Subtotal $2,517, tax $251.70, total $2,768.70. The trim line is what makes this invoice hard to argue with: 60 feet at $4.20 is a figure the customer can measure. The day rate covers bench and site time only, because the build and the doors are already priced by the unit.

Per unit or per day, and which one protects you

A day rate bills the time you actually spend and protects you when a job turns out harder than it looked. A per unit price is easier to sell and better when you are fast, and it punishes you when the walls are not square.

Old properties are the deciding factor. Nothing is plumb, nothing is standard, and a per-door price agreed for a new build will lose money in a Victorian terrace. Quote day rate where the substrate is unknown, per unit where it is not.

Whichever you choose, the invoice repeats the quote. A customer who agreed a per-door price and receives a day rate cannot reconcile it, and reconciling it is what they will spend the next week asking you to do.

Timber, waste and the price that moved since you quoted

Timber pricing is volatile in a way that most trades do not have to manage, and a quote given six weeks before a job can be materially wrong by the time you buy.

Two protections, both on paper. Price materials as a separate line so a movement is visibly a materials issue rather than an inflated labor charge. And put a validity period on the quote so the price has a stated shelf life.

On waste, state the allowance rather than hiding it in the quantity. A customer reading ten percent cutting allowance understands it. A customer who counts the boards and finds more than the room needed does not.

Supply and fit, and the kitchen the customer bought elsewhere

Supply and fit is one job with one point of responsibility. Fitting something the customer bought is a different job with the responsibility split, and the invoice should show that.

Where you supply, the materials line is yours and so is the warranty on them. Where the customer supplies, say on the invoice that goods were fitted as provided and that damage or shortage in customer-supplied items is not your liability.

That single sentence is what stops a missing bracket or a damaged door becoming your problem at your cost, on a job where you never had control of the purchase.

Hourly, fixed price or per unit: how carpenters price the work

Carpentry prices in more units than any other trade, and the unit is usually decided by what the customer is buying rather than by what you prefer. A door is a unit. A staircase is a job. A week of trim-out for a builder is a day rate. All three are correct.

ModelWhere it winsWhat it quietly costs you
Per unitDoors, windows, trim, kitchens, anything countableOld properties are never square, and a per-unit price set on new build loses there
Per job, fixedCustom work, staircases, built-in furniture, anything designedThe drawing is the scope, so any change to it is a change to the price
Day rateTrim-out runs, site work, anything a builder is programmingYou are paid for time rather than skill, so the fast carpenter earns least

Repeat the unit you quoted on the invoice, with the count showing. Nearly every carpentry billing dispute is a customer who was quoted per door and invoiced per day, or the reverse, and it costs more in goodwill than the difference was ever worth.

Working out what to charge

Carpentry prices move with the lumber yard and with how square the house is, so a rate from a web page is no help. The cost estimator builds a job price from your own lumber and hours, and the markup calculator sets the margin on the materials you pass on.

Getting paid once it is sent

On made-to-measure work, take a deposit that covers the lumber before you cut anything, because a customer who cancels after you have built the carcasses leaves you holding pieces nobody else can use. If the due date passes, the late fee calculator works out what your terms allow and the due date calculator sets the new date.

QuoteDepositInvoiceDue day 14Chase day 21
Quote: On anything designed or made to measureDeposit: On custom work, covering the lumberInvoice: Sent the day the work finishesDue day 14: The date printed on the documentChase day 21: Reminder, then your late fee

Five dates decide whether a carpenter gets paid on time, and four of them are set before the work starts.

Mistakes that cost carpenters money

  • Changing units between quote and invoice. The customer cannot reconcile it, so they query it.
  • Timber inside the labor figure. A price rise looks like you increased your rate.
  • Waste hidden in quantities. Stated it is normal, discovered it looks like padding.
  • No note on customer-supplied goods. Their damaged door becomes your problem at your cost.
  • Finish assumed. Customers assume painting is included unless the invoice says otherwise.

Carpenter / cabinetmaker invoice questions

How do I invoice as a carpenter?

Invoice in the unit you quoted with the count showing, price lumber separately, state any waste allowance, separate supply from installation and note whether finishing is included. The generator opens a carpentry invoice with cabinetry, doors, trim and labor already listed.

Should I charge a day rate or per unit?

Per unit is easier to sell and rewards speed; a day rate protects you when the substrate is unknown. Older properties are the deciding factor, because nothing is square and a per-unit price agreed for new build will lose money there.

How do I handle timber price rises?

Price materials as their own line and put a validity period on your quote. Then a rise is visibly a materials movement rather than something that looks like an increase in your labor rate.

Should I charge for waste?

State the allowance rather than burying it in quantities. A customer reading a ten percent cutting allowance accepts it; a customer who counts leftover boards and works it out for themselves does not.

What if the customer supplies the materials?

Fit them at your normal rate and put a line on the invoice saying goods were installed as supplied and that shortages or damage in customer-supplied items are not your liability.

What should a carpentry invoice include?

Your business and the customer, the property, an invoice number and date, the work in the unit quoted with counts, lumber and materials separately, waste allowance, whether finishing is included, the total and your terms.

Do I include painting and finishing?

Only if you say so. Customers routinely assume finishing is part of carpentry work, so the invoice should state the position either way.

What does a carpentry invoice look like?

Like the example on this page: your business and the client at the top, an invoice number, the issue date and a due date 14 days out, then custom cabinetry build, door hanging (per door), trim and baseboard (per linear foot) and labor (per day) as separate lines, each with a quantity, rate and amount. Below them sit the subtotal ($2,517), tax on its own line and the total due ($2,768.70), then the payment terms and a note on finish.

Free carpenter invoice template

The free carpenter invoice template opens with the lines above already priced, in any of 10 designs made for the trade, and exports a print-ready PDF with nothing saved to a server. Opening a design needs a free account.

Everything on this site, set up for carpenters

The whole toolkit, with the reason each one matters to carpenters rather than in general. The four marked links open with carpenter / cabinetmaker already selected.

Make the document on site

Three of these arrive with carpenter / cabinetmaker already selected, so the first line is custom cabinetry build rather than an empty row.

Templates you can take to the job

The same carpenter lines, in whatever file the person paying you expects.

Work out the number first

Get it paid before you are on the next job

Terms of 14 days is the shape this guide assumes. Deposit: on custom work, covering the lumber.

Read next

What this is. A guide and template written by Michael Reed. It is not legal advice. Deposit, cancellation and late fee rules differ by state, so have any wording you rely on checked for your state before it goes on a real document.

Last reviewed by InvoiceTools, Houston, Texas, on 18 September 2026.

The paperwork is the part that gets you paid