The short version
Electrical work produces paperwork nobody else generates: certificates, test results, notifications. The invoice has to sit alongside that paperwork and reference it, because the certificate is often what the customer actually needs.
What goes on a electrician invoice
Six things, in the order they belong on the page. The invoice generator opens a electrician document with the lines already in place, so most of this is checking rather than typing.
- Bill labor with the hours showing. The count on the line, so the customer sees what was worked rather than one figure.
- Put certification and testing on its own line. Testing, recording readings and issuing the certificate is work, and it is the part a customer may need for a sale or a landlord check.
- Name the circuits or the work location. Which board, which circuits, which rooms. It is what makes an invoice checkable months later.
- Price materials separately. Cable, accessories and the electrical panel itself move independently of your labor.
- Reference the certificate number. Put it on the invoice. The two documents belong together and customers lose one of them.
- State the notification or building control position. Where work needs a permit, say who is notifying and whether a fee is included.
The lines a electrician invoice usually carries
These are the lines the generator opens with when you pick Electrician. The figures are a starting point to type over rather than a going rate: this site runs no pricing survey, and the number on your invoice should be the one you charge.
| Line | What it covers | Qty | Opens at |
|---|---|---|---|
| Electrical panel replacement | Remove the existing board, install and wire the new electrical panel, fit GFCI and AFCI protection and label every circuit. | 1 | $650 |
| Socket or switch installation | Fit each new socket or switch, connect to the existing circuit, and patch the wall around the box. | 4 | $55 |
| Labor (per hour) | Rough-in and trim-out work charged as worked, including safe isolation and reinstating power. | 3 | $60 |
| Certification and testing | Test every affected circuit, record the readings and issue the certificate for the work carried out. | 1 | $120 |
Add, rename, reorder or delete any line, and set tax per line where it applies. Priced as they open, that comes to $1,170 before tax.
A worked electrician invoice, filled in
This is the same job as the table above, written out the way it would leave your phone. Every figure on it is a starting point rather than a going rate, and the tax line is shown at ten per cent purely so the arithmetic is visible: set your own rate, or none, per line.
INVOICE
Bill to
Your client name
Client address
Work carried out at
Job address
Job or order reference
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Electrical panel replacement | 1 | $650 | $650 |
| Socket or switch installation | 4 | $55 | $220 |
| Labor (per hour) | 3 | $60 | $180 |
| Certification and testing | 1 | $120 | $120 |
| Subtotal | $1,170 |
| Tax at 10% | $117 |
| Total due | $1,287 |
Late payment. State your own rate and when it starts, so it is agreed before the due date rather than argued after it.
Subtotal $1,170, tax $117, total $1,287. The parts worth copying are the structure rather than the numbers: the job reference next to the client, every line separately priced with its count showing, the tax on its own line, and terms that name a number of days instead of saying on receipt.
The certificate is the deliverable, so bill it as one
For a lot of electrical work the customer is not really buying the labor, they are buying the certificate at the end of it. A landlord needs it to let, a seller needs it to sell, a business needs it to satisfy an insurer.
Name certification and testing as its own line. It reflects real work: testing every affected circuit, recording readings, and issuing the document. It also stops the certificate being treated as a free attachment to the job.
Put the certificate reference on the invoice too. Customers keep the invoice and lose the certificate, and being able to match them a year later saves you a phone call you are not paid for.
Work that needs a permit, building control and who pays the fee
Some electrical work carries a notification obligation, and the cost of that notification has to sit somewhere. If it is not on your invoice, it is in your margin.
State on the document who is notifying and whether the fee is included or charged at cost. Where a building control submission is being made, that is a disbursement like any other and belongs on its own line.
This also protects you commercially. A customer who later discovers there was a fee, and assumed you had absorbed it, is a customer with a grievance about a number they never actually saw.
Working for a main contractor rather than a homeowner
Subcontracting to a builder or a main contractor changes the invoice completely. The payer works to applications, valuations and payment cycles rather than to a bill.
Reference their site, their order number and the period the work covers. Where you are one of several trades, the reference is what stops your invoice sitting in a pile while somebody works out which job it belongs to.
Agree in advance whether retention applies and what percentage, because discovering it when the payment lands short is the worst time to have that conversation. Terms in days, always.
Hourly, fixed price or per unit: how electricians price the work
Electrical work is priced three ways depending on who is buying. Householders buy jobs, builders buy days, and testing work is priced per unit because the unit is what the certificate counts. The mistake is letting a domestic customer think they bought a day when they bought a job.
| Model | Where it wins | What it quietly costs you |
|---|---|---|
| Per job, fixed | Electrical panel changes, rewires, additional circuits, EV points | The unknown behind the plaster is yours, so price the investigation separately |
| Day rate | Rough-in and trim-out for a builder, site work, anything program-led | A contractor will always compare it to a price, so state what a day delivers |
| Per point or per circuit | Testing, inspection, remedials and anything the certificate enumerates | Small jobs stop being worth the visit, so it needs a minimum charge behind it |
Testing and certification deserve their own line whatever model you use, because they are what the customer needs to satisfy a landlord, a buyer or an insurer. An invoice that folds the certificate into the labor figure has hidden the part with the longest life.
Working out what to charge
This guide is about what goes on the document, not what the number should be, and nobody should hand you a rate for your own market. What the site can do is the arithmetic: the freelance rate calculator works back from what you need to earn, the service price calculator prices a service against your costs, and the profit margin calculator checks what is left once the job is done.
Writing it on your phone, in five steps
Most electricians write the invoice standing next to the work rather than at a desk a week later, and the week later version is the one that gets details wrong. The generator is built for the first case.
- Open it with your trade already chosen. The electrician invoice loads with electrical panel replacement and the rest of the lines already on the page.
- Put the client and the job reference in first. It is the part you will not remember accurately in three days, and on agent, landlord or contractor work it is the reason the invoice gets paid at all.
- Edit the lines rather than starting from empty. Change the quantities and the rates, delete what you did not do, add what you did. Keeping the descriptions means the wording stays consistent from one job to the next.
- Set the terms to 14 days and add a payment link. A due date that is an actual date gets chased. A link and a QR code means it can be settled before you have packed up.
- Send it before you leave. The clock on your terms starts when the invoice arrives, not when the work finished, so every day it sits unsent is a day added to getting paid.
Getting paid once it is sent
Put a due date and your terms on the document, because an invoice without them is hard to chase. Add a payment link and a QR so settling up is a tap rather than a transfer somebody has to set up. When part of it lands, the receipt maker records it as a part payment and prints the balance still due. If the due date passes, the late fee calculator works out what your own terms allow and writes the chasing letter to go with it.
Five dates decide whether a electrician gets paid on time, and four of them are set before the work starts.
Mistakes that cost electricians money
- Certification given away as an attachment. It is work and often the whole deliverable. Bill it.
- No certificate reference on the invoice. The customer loses one of the two documents and you cannot match them later.
- Notification fees absorbed. A cost the customer never sees is a cost you paid.
- No circuit or location detail. An invoice nobody can check months later is an invoice that gets queried.
- No retention agreed on contractor work. You find out when the payment lands short.
Electrician invoice questions
How do I write an electrician invoice?
Show labor hours with the count, put certification and testing on its own line, name the circuits or location, price materials separately and reference the certificate number. The generator opens an electrical invoice with electrical panel work, sockets, labor and testing already listed.
Should I charge separately for testing and certification?
Yes. Testing circuits, recording readings and issuing the certificate is real work, and for many jobs the certificate is the thing the customer actually needs. Left off the invoice it becomes a free attachment.
Who pays the building control or notification fee?
Whoever the invoice says, which is why it should say. Charge it at cost as a disbursement on its own line, or state that it is included, but do not leave it to be assumed.
How do I invoice a main contractor?
With their site reference and order number, the period covered and terms in days. Agree whether retention applies and at what percentage before you start rather than when the payment arrives short.
What should an electrician invoice include?
Your business and the customer, the property, an invoice number and date, labor with hours, materials, certification and testing, the certificate reference, any notification fee, the total and your terms.
Should I put the certificate number on the invoice?
Yes. Customers keep invoices and lose certificates, and having the reference on the surviving document saves you reissuing paperwork you were not paid to reissue.
How do I charge for emergency electrical work?
With a stated out-of-hours or emergency rate that exists on your invoice template before the callout happens, so it is applied rather than negotiated at the door.
Free electrician invoice template
The free electrician invoice template opens with the lines above already priced, in any of 200 designs, and exports a print-ready PDF with no signup and nothing saved to a server. If you would rather edit a file offline, there are 72 Word templates, 72 Excel templates with the totals already calculating, and 72 fillable PDFs.
Invoicing guides for related trades
The same billing questions come up next door. These four guides cover the trades closest to electricians, and each one sits alongside its own free template.
Every trade has one: see all 46 invoicing guides, or go straight to the 46 free invoice templates they describe.
Everything on this site, set up for electricians
The whole toolkit, with the reason each one matters to electricians rather than in general. The five marked links open with electrician already selected.
Make the document on site
Five of these arrive with electrician already selected, so the first line is electrical panel replacement rather than an empty row.
- Invoice Generatoropens set to this trade. The electrician invoice this guide describes, priced and ready to edit.
- Quote Generatoropens set to this trade. Quote first: always, on work that needs a permit. Converts to the invoice without retyping.
- Receipt MakerRecords a payment on the day and prints the balance still owed on the job.
- Recurring InvoicesFor electricians billing the same client on the same day every month.
- Purchase OrderOrder materials from the merchant on a numbered document they can match.
- Work OrderSend a second pair of hands to a job with the scope written down first.
- Cost Estimatoropens set to this trade. Build the job up from materials, labor and margin before you quote it.
Templates you can take to the job
The same electrician lines, in whatever file the person paying you expects.
- Electrician invoice templateThe template this guide is written about, with the electrician lines already on it.
- 200 invoice designsopens set to this trade. Put those lines in any of 200 designs and keep the one you like.
- 72 Word templatesEdit offline, or send a file a client can fill in themselves.
- 72 Excel templatesThe totals calculate themselves, which matters on a long line list.
- 72 fillable PDFsType into the fields and print, with nothing to install.
- Google Docs templatesCopy to your own Drive and edit from a phone.
- Google Sheets templatesSame totals, shared with whoever does your books.
- Blank invoice templatesA plain document for the job that does not fit any list you have.
- Quote templatesA priced quote on paper, for a client who wants the figure before the work.
- Estimate templatesA figure that is explicitly not a fixed price, on a job you have not opened up yet.
- Receipt templatesProof of payment for a client who needs it for their own records.
- Work order templatesThe scope, the site and the authorisation, before anybody drives out.
Work out the number first
This guide is about the document. These are for deciding what goes on it.
- Markup CalculatorTurn what a job costs you into the price you charge, without confusing markup with margin.
- Profit Margin CalculatorCheck what is actually left on a electrician job once materials and time are paid for.
- Break-Even CalculatorWork out how many jobs a month cover your costs before anything is profit.
- Service Price CalculatorPrice a service against your own costs rather than against what somebody else charges.
- Sales Tax CalculatorAdd or strip tax on a figure before it goes on the invoice.
- Invoice CalculatorTotal up lines, tax and a deposit before you commit them to the document.
Get it paid before you are on the next job
Terms of 14 days is the shape this guide assumes. Deposit: on rewires and anything with a materials outlay.
- Payment links and QR codesA link and a scannable code on the invoice, so paying is a tap.
- Late fee calculatoropens set to this trade. Works out what your own terms allow and writes the chasing letter.
- Payment terms guideWhich terms actually get invoices paid, and the exact wording to use.
- Deposit invoicesWhen to ask, how much, and how the final invoice shows the balance.
- Chasing an unpaid invoiceThe reminder, the call, the overdue notice, then what comes after.
- Progress billingBilling a long job in stages so you are not funding it yourself.
- Invoice numberingA numbering system that never repeats and never skips.
- Change ordersPricing extra work in a way the customer has already agreed to.
Read next
- All 46 invoicing guidesThe same guide, written for every other trade on the site.
- 46 trade invoice templatesEvery trade, each opening with its own lines already priced.
- Invoicing glossaryPlain definitions of the words on an invoice, a quote and a job.
- The blogLonger pieces on quoting, billing, tax and getting paid.
- All 24 toolsEverything on the site in one list, including the ones not named here.